On site at 75 London Wall

We are on site at 75 London Wall – the former headquarters of Deutsche Bank. The building is being repositioned by ORMS to become a destination for work and culture, breaking the cycle of demolition and new-build by growing the new architecture out of the existing structure.

We are cleaning and restoring the natural stone on levels 1–4, with salvaged stone from the upper levels being brought back to our manufacturing facility to be recut and repurposed within the new design – produced alongside the architectural precast concrete and terracotta-faced panels for the new-build envelope. Old and new, manufactured side-by-side.

Client: Gamuda Berhad / Castleforge

Architect: ORMS

Façade Consultant: Eckersley O’Callaghan

Contractor: Multiplex Construction Europe

CGI:  Glass Canvas